Rockingham Bridges-I91

The Vermont Agency of Transportation in conjunction with the design/build team of Reed & Reed, Inc. will complete bridge replacement on the I-91 bridges #24S & 24N over the Williams River in Rockingham, VT. This project has an anticipated completion date of June 15, 2020.

I-91 NORTHBOUND & SOUTHBOUND ARE REDUCED TO ONE LANE WITHIN THE CONSTRUCTION ZONE.


I-91 NORTHBOUND MOTORISTS SHOULD BE AWARE OF MERGING RAMP TRAFFIC ENTERING THE ROADWAY! 

PLEASE USE CAUTION!


Anyone with questions or concerns regarding the project may contact Stephanie Barrett, Public Relations Officer at 802-862-6085 or toll free at 866-602-6868.

Follow us on Facebook    Follow us on Twitter (#91rockbridges)  Live Traffic Camera

Facebook Logo

Rockingham Bridges I-91

Written by on April 25, 2019 in Rockingham Bridges-I91

The following is the anticipated work schedule on the I-91 bridges for the week beginning Monday, April 29, 2019:

Monday thru Friday:

  • Work begins on building the crossover to re-route all traffic onto the NB Bridge
  • Work continues on SB Pier #3 to include placement of 2nd shaft
  • Prep work for 1st placement of concrete at SB Pier #2

NARROW LANES – USE CAUTION!

Rockingham Bridges I-91

Written by on April 25, 2019 in Rockingham Bridges-I91
Rockingham Bridges I-91

Tomorrow, April 26, 2019 @ 6:30a.m.:

  • Weather permitting, there will be a I-91 northbound rolling road block for line striping before northbound motorists will be directed onto one lane of the newly constructed bridge.  Motorists can anticipate approximately a 25-minute delay in their travels.  Southbound traffic will still travel over one lane of the existing southbound bridge until a crossover is built.  
  • I-91 Exit 6 northbound On-Ramp will be opened up within an hour after the rolling road block clears and traffic is back up to speed over to the new I-91 Northbound Bridge.

Please note:  If weather does not permit this to happen then the rain date will be for Monday, April 29, 2019 @ 9:30a.m.

Rockingham Bridges I-91

Written by on April 18, 2019 in Rockingham Bridges-I91

The following is the anticipated work schedule on the I-91 bridges for the week beginning Monday, April 22, 2019:

Monday thru Friday:

  • I-91 Exit 6 northbound On-Ramp remains closed for the week during ramp reconstruction to its original grade.  All motorists to follow the signed detoured on Route 5 north to the Exit 7 northbound On-Ramp.  The ramp is anticipated to be opened up on April 26, 2019 at which time all traffic will be switched over to the new I-91 Northbound Bridge.
  • Weather permitting, paving the NB Bridge approaches
  • Guardrail installation on the NB Bridge approaches
  • Pavement markings on the NB Bridge and approaches
  • Installation of new NB traffic control devices
  • Work continues on Pier #3 to include placement of 2nd shaft
  • Continue to excavate and remove ledge at Pier #2 SB cofferdam

Friday – April 26, 2019:

  • Weather permitting, there will be a northbound rolling road block as motorists are directed over the newly constructed northbound bridge.  Motorists can anticipate approximately a 10-minute delay in their travels.  The start of the road block will be listed in next week’s release.

I-91 NORTHBOUND & SOUTHBOUND IS REDUCED TO ONE LANE WITH NO SHOULDERS WITHIN THE CONSTRUCTION ZONE. 

I-91 NORTHBOUND MOTORISTS SHOULD BE AWARE OF MERGING RAMP TRAFFIC ENTERING THE ROADWAY!
PLEASE USE CAUTION!

Rockingham Bridges I-91

Written by on April 11, 2019 in Rockingham Bridges-I91

The following is the anticipated work schedule on the I-91 bridges for the week beginning Monday, April 15, 2019:

IMPORTANT NOTIFICATION

Monday thru Friday:

  • 7 a.m. I-91 Exit 6 northbound On-Ramp will be closed for two weeks while the ramp is reconstructed to its original grade.  All motorists will follow a signed detoured on Route 5 north to the Exit 7 northbound On-Ramp.  The ramp is anticipated to be opened up on April 26, 2019 at which time all traffic will be switched over to the new I-91 Northbound Bridge.
  • Fine grading of the NB Bridge approaches
  • Grinding and fine grading of the NB Bridge approaches
  • Weather permitting, paving the NB Bridge and approaches
  • Continue to excavate and remove ledge at Pier #2 SB cofferdam

I-91 NORTHBOUND & SOUTHBOUND IS REDUCED TO ONE LANE WITH NO SHOULDERS WITHIN THE CONSTRUCTION ZONE. 

I-91 NORTHBOUND MOTORISTS SHOULD BE AWARE OF MERGING RAMP TRAFFIC ENTERING THE ROADWAY!
PLEASE USE CAUTION!

Rockingham Bridges I-91

Written by on April 4, 2019 in Rockingham Bridges-I91

The following is the anticipated work schedule on the I-91 bridges for the week beginning Monday, April 08, 2019:

IMPORTANT NOTIFICATION

On Monday, April 15, 2019 at 7 a.m. we will be closing the I-91 Exit 6 northbound On-Ramp for two weeks while the ramp is reconstructed to its original grade.  All motorists will follow a signed detoured on Route 5 north to the Exit 7 northbound On-Ramp.  The ramp is anticipated to be opened up on April 26, 2019 at which time all traffic will be switched over to the new I-91 Northbound Bridge.

************************************************************************

Monday thru Friday:

  • Preparation work for placement of concrete at Pier #3 southbound
  • Continue to excavate and remove ledge at Pier #2 SB cofferdam
  • Grinding and fine grading of the NB Bridge approaches
  • Continue installation of concrete curb on the bridge corners
  • Continue maintenance of traffic control devices, due to weather

I-91 NORTHBOUND & SOUTHBOUND IS REDUCED TO ONE LANE WITH NO SHOULDERS WITHIN THE CONSTRUCTION ZONE. 

I-91 NORTHBOUND MOTORISTS SHOULD BE AWARE OF MERGING RAMP TRAFFIC ENTERING THE ROADWAY!
PLEASE USE CAUTION!

Rockingham Bridges I-91

Written by on March 28, 2019 in Rockingham Bridges-I91, Uncategorized

The following is the anticipated work schedule on the I-91 bridges for the week beginning Monday, April 01, 2019:

********************* IMPORTANT NOTIFICATION *********************

On Monday, April 15, 2019 at 7 a.m. we will be closing the I-91 Exit 6 northbound On-Ramp for two weeks while the ramp is reconstructed to its original grade.  All motorists will follow a signed detoured on Route 5 north to the Exit 7 northbound On-Ramp.  The ramp is anticipated to be opened up on April 26, 2019 at which time all traffic will be switched over to the new I-91 Northbound Bridge.

************************************************************************

Monday thru Friday

  • Continue form work for Pier #3 southbound footing
  • Continue to excavate and remove ledge at Pier #2 SB cofferdam
  • Continue various items for the completion of the NB Bridge to include the installation of the deck membrane and concrete curb on the bridge corners
  • Continue maintenance of traffic control devices, due to weather

I-91 NORTHBOUND & SOUTHBOUND IS REDUCED TO ONE LANE WITH NO SHOULDERS WITHIN THE CONSTRUCTION ZONE. 

I-91 NORTHBOUND MOTORISTS SHOULD BE AWARE OF MERGING RAMP TRAFFIC ENTERING THE ROADWAY!
PLEASE USE CAUTION!

Rockingham Bridges I-91

Written by on March 21, 2019 in Rockingham Bridges-I91

The following is the anticipated work schedule on the I-91 bridges for the week beginning Monday, March 25, 2019:

Monday thru Friday:

  • Begin form work for Pier #3 southbound footing
  • Complete install of “Sheet Pile” at Pier #2 SB for ground stabilization
  • Excavation and ledge removal at Pier #2 SB cofferdam
  • Continue various items for the completion of the NB Bridge to include placement of curb
  • Continue maintenance of traffic control devices, due to weather

I-91 NORTHBOUND & SOUTHBOUND IS REDUCED TO ONE LANE WITH NO SHOULDERS WITHIN THE CONSTRUCTION ZONE. 

I-91 NORTHBOUND MOTORISTS SHOULD BE AWARE OF MERGING RAMP TRAFFIC ENTERING THE ROADWAY!
PLEASE USE CAUTION!

Rockingham Bridges I-91

Written by on March 14, 2019 in Rockingham Bridges-I91

The following is the anticipated work schedule on the I-91 bridges for the week beginning Monday, March 18, 2019:

Monday thru Friday:

  • Continue driving “H-Pile” at Pier #3 southbound
  • Continue driving “Sheet Pile” at Pier #2 southbound for ground stabilization
  • Continue installation of hangers & conduit under the NB Bridge
  • Continue maintenance of traffic control devices, due to weather

I-91 NORTHBOUND & SOUTHBOUND IS REDUCED TO ONE LANE WITH NO SHOULDERS WITHIN THE CONSTRUCTION ZONE. 

I-91 NORTHBOUND MOTORISTS SHOULD BE AWARE OF MERGING RAMP TRAFFIC ENTERING THE ROADWAY!
PLEASE USE CAUTION!

Rockingham Bridges I-91

Written by on March 7, 2019 in Rockingham Bridges-I91

ROLLING ROAD BLOCKS

Friday, March 08, 2019 beginning at 8:30 am motorists can expect a rolling road block both northbound and southbound for approximately 10 minute delay in travel while crews make roadway repairs over the Rockingham Bridge.

Rockingham Bridges I-91

Written by on March 7, 2019 in Rockingham Bridges-I91

The following is the anticipated work schedule on the I-91 bridges for the week beginning Monday, March 11, 2019:

Monday thru Friday:

  • Continue driving “H-Pile” at Pier #3 southbound
  • Continue driving “Sheet Pile” at Pier #2 southbound for ground stabilization
  • Continue installation of hangers & conduit under the NB Bridge
  • Continue maintenance of traffic control devices, due to weather

I-91 NORTHBOUND & SOUTHBOUND IS REDUCED TO ONE LANE WITH NO SHOULDERS WITHIN THE CONSTRUCTION ZONE. 

I-91 NORTHBOUND MOTORISTS SHOULD BE AWARE OF MERGING RAMP TRAFFIC ENTERING THE ROADWAY!
PLEASE USE CAUTION!