The anticipated work schedule on VT Route 117

It’s that time of the year again!

The following is an update to the work schedule for the week beginning Monday, April 01, 2019:

Monday & Tuesday:

  • Traffic control sign packages to be installed

Wednesday thru Friday:

  • Weather permitting, ledge removal and underdrain work to begin between the Essex/Jericho town line and Skunk Hollow Road

Rockingham Bridges I-91

Written by on March 28, 2019 in Rockingham Bridges-I91, Uncategorized

The following is the anticipated work schedule on the I-91 bridges for the week beginning Monday, April 01, 2019:

********************* IMPORTANT NOTIFICATION *********************

On Monday, April 15, 2019 at 7 a.m. we will be closing the I-91 Exit 6 northbound On-Ramp for two weeks while the ramp is reconstructed to its original grade.  All motorists will follow a signed detoured on Route 5 north to the Exit 7 northbound On-Ramp.  The ramp is anticipated to be opened up on April 26, 2019 at which time all traffic will be switched over to the new I-91 Northbound Bridge.

************************************************************************

Monday thru Friday

  • Continue form work for Pier #3 southbound footing
  • Continue to excavate and remove ledge at Pier #2 SB cofferdam
  • Continue various items for the completion of the NB Bridge to include the installation of the deck membrane and concrete curb on the bridge corners
  • Continue maintenance of traffic control devices, due to weather

I-91 NORTHBOUND & SOUTHBOUND IS REDUCED TO ONE LANE WITH NO SHOULDERS WITHIN THE CONSTRUCTION ZONE. 

I-91 NORTHBOUND MOTORISTS SHOULD BE AWARE OF MERGING RAMP TRAFFIC ENTERING THE ROADWAY!
PLEASE USE CAUTION!

Rockingham Bridges I-91

Written by on March 21, 2019 in Rockingham Bridges-I91

The following is the anticipated work schedule on the I-91 bridges for the week beginning Monday, March 25, 2019:

Monday thru Friday:

  • Begin form work for Pier #3 southbound footing
  • Complete install of “Sheet Pile” at Pier #2 SB for ground stabilization
  • Excavation and ledge removal at Pier #2 SB cofferdam
  • Continue various items for the completion of the NB Bridge to include placement of curb
  • Continue maintenance of traffic control devices, due to weather

I-91 NORTHBOUND & SOUTHBOUND IS REDUCED TO ONE LANE WITH NO SHOULDERS WITHIN THE CONSTRUCTION ZONE. 

I-91 NORTHBOUND MOTORISTS SHOULD BE AWARE OF MERGING RAMP TRAFFIC ENTERING THE ROADWAY!
PLEASE USE CAUTION!

Rockingham Bridges I-91

Written by on March 14, 2019 in Rockingham Bridges-I91

The following is the anticipated work schedule on the I-91 bridges for the week beginning Monday, March 18, 2019:

Monday thru Friday:

  • Continue driving “H-Pile” at Pier #3 southbound
  • Continue driving “Sheet Pile” at Pier #2 southbound for ground stabilization
  • Continue installation of hangers & conduit under the NB Bridge
  • Continue maintenance of traffic control devices, due to weather

I-91 NORTHBOUND & SOUTHBOUND IS REDUCED TO ONE LANE WITH NO SHOULDERS WITHIN THE CONSTRUCTION ZONE. 

I-91 NORTHBOUND MOTORISTS SHOULD BE AWARE OF MERGING RAMP TRAFFIC ENTERING THE ROADWAY!
PLEASE USE CAUTION!

Rockingham Bridges I-91

Written by on March 7, 2019 in Rockingham Bridges-I91

ROLLING ROAD BLOCKS

Friday, March 08, 2019 beginning at 8:30 am motorists can expect a rolling road block both northbound and southbound for approximately 10 minute delay in travel while crews make roadway repairs over the Rockingham Bridge.

Rockingham Bridges I-91

Written by on March 7, 2019 in Rockingham Bridges-I91

The following is the anticipated work schedule on the I-91 bridges for the week beginning Monday, March 11, 2019:

Monday thru Friday:

  • Continue driving “H-Pile” at Pier #3 southbound
  • Continue driving “Sheet Pile” at Pier #2 southbound for ground stabilization
  • Continue installation of hangers & conduit under the NB Bridge
  • Continue maintenance of traffic control devices, due to weather

I-91 NORTHBOUND & SOUTHBOUND IS REDUCED TO ONE LANE WITH NO SHOULDERS WITHIN THE CONSTRUCTION ZONE. 

I-91 NORTHBOUND MOTORISTS SHOULD BE AWARE OF MERGING RAMP TRAFFIC ENTERING THE ROADWAY!
PLEASE USE CAUTION!