ESSEX, JERICHO-RICHMOND VT ROUTE 117
The Vermont Agency of Transportation along with Pike Industries Inc. will begin this 2018 – 2019 roadway rehabilitation project of VT Route 117 beginning in Essex where the State Highway begin to the intersection Route 2 in Richmond the week beginning June 18, 2018. The anticipated completion date is October 11, 2019.
This project will consist of rehabilitation of the existing roadway sub-base, new traveling surface with shoulder widening (where feasible), drainage, guardrail and signage upgrades, new signal at the intersection of 289 off ramp and VT 117 along with other incidental items throughout the project.
During the construction period, motorists should expect traffic flow to be maintained at all times with one-way alternating traffic during construction hours with control present.
Motorists should also expect to be traveling on a gravel surface from approximately mid-July 2018 through August 2018.from Essex where the State Highway begins to the Jericho town line.
Anyone with questions or concerns regarding the project may contact Stephanie Barrett, Public Outreach Coordinator at 802-862-6085.
- Pot hole patching between Barber Farm Road and the Jericho/Richmond town line.
- Continued culvert work to continue between Barber Farm Road and the Jericho/Richmond town line.
- Structure rehabilitation and sidewalk work to continue between VT 289 ramps and Tiffany Lane.
- Shoulder / ditch work will continue between Sand Hill Road and VT 289.
The anticipated work schedule for is as follows:
• Structure rehabilitation, curb, sidewalk and ramp work to continue between VT 289 ramps and Tiffany Lane.
Traffic control will be present allowing for one lane of alternating traffic through the work zones. Motorists expect delays!
DRIVE SLOW – USE CAUTION!
- Guardrail work resumes between Sand Hill Road and VT 289 ramps.
- Structure rehabilitation work to continue between VT 289 ramps and Tiffany Lane.
- Curb and sidewalk work at Mall Drive at the west end of the project in Essex.
- Shoulder / ditch work will continue between Sand Hill Road and VT 289.
- Weather permitting, paving at the Sand Hill Road intersection to tie into VT 117.
- Guardrail work resumes between Greenfield Road and VT 289 ramps.
- Continued culvert work to continue between Barber Farm Road and the Jericho/Richmond town line.
- Structure rehabilitation work to continue between VT 289 ramps and Tiffany Lane.
- Curb and sidewalk work at Mall Drive at the west end of the project in Essex.
- Shoulder / ditch work will continue between No. Williston Road and Greenfield Road.
- Shoulder / ditch work will continue between No. Williston Road and Greenfield Road.
- Continued culvert work to continue between Barber Farm Road and the Jericho/Richmond town line.
- Structure rehabilitation work to continue between VT 289 ramps.
- Shoulder / ditch work will continue between the Essex/Jericho town line and Sand Hill Road.
- Continued culvert work to continue between Bradley Bow Road and the Jericho/Richmond town line.
- Structure rehabilitation work to continue between VT 289 and Valley View Road.
- Weather permitting, paving between/around the VT 289 on/off ramps with leveling course.
- Weather permitting, continued paving base course between Valleyview Road and Tiffany Lane.
- Continued culvert work Barber Farm Road and Jericho/Richmond town line.
- Patching of the culvert crossing near the Jericho/Richmond town line.
- Shoulder / ditch work will continue between VT 289 and Greenfield Road.
- Continued culvert work Barber Farm Road and Bradley Bow Road.
- Guardrail work will continue around the Sand Hill Road intersection.
- General clean up work between Valley View Road and Tiffany Lane.
- Weather permitting, paving to resume between Valley View Drive and Tiffany Lane.
- Shoulder / ditch work will continue between N. Williston Road and Sand Hill Road.
- Continued culvert work Barber Farm Road and Bradley Bow Road.
- Guardrail work will continue between N. Williston Road and Sand Hill Road.
Connect