Rockingham Bridges I-91

Written by on April 18, 2019 in Rockingham Bridges-I91

The following is the anticipated work schedule on the I-91 bridges for the week beginning Monday, April 22, 2019:

Monday thru Friday:

  • I-91 Exit 6 northbound On-Ramp remains closed for the week during ramp reconstruction to its original grade.  All motorists to follow the signed detoured on Route 5 north to the Exit 7 northbound On-Ramp.  The ramp is anticipated to be opened up on April 26, 2019 at which time all traffic will be switched over to the new I-91 Northbound Bridge.
  • Weather permitting, paving the NB Bridge approaches
  • Guardrail installation on the NB Bridge approaches
  • Pavement markings on the NB Bridge and approaches
  • Installation of new NB traffic control devices
  • Work continues on Pier #3 to include placement of 2nd shaft
  • Continue to excavate and remove ledge at Pier #2 SB cofferdam

Friday – April 26, 2019:

  • Weather permitting, there will be a northbound rolling road block as motorists are directed over the newly constructed northbound bridge.  Motorists can anticipate approximately a 10-minute delay in their travels.  The start of the road block will be listed in next week’s release.

I-91 NORTHBOUND & SOUTHBOUND IS REDUCED TO ONE LANE WITH NO SHOULDERS WITHIN THE CONSTRUCTION ZONE. 

I-91 NORTHBOUND MOTORISTS SHOULD BE AWARE OF MERGING RAMP TRAFFIC ENTERING THE ROADWAY!
PLEASE USE CAUTION!