Monday thru Friday:
- Continue roadway excavation in various areas between Tiffany Lane to Sand Hill Road.
- Begin reclaiming the roadway from the Essex/Jericho Town line proceeding north. Reclaim takes 10″ of the road surface and basically rototills it and places it back as a gravel surface, recycling the existing material.
- ROADWAY MAINTENANCE THROUGHOUT THE PROJECT!
Motorists please be aware that the roadway surface will be rough for a duration of time – please drive slowly!
Roadway maintenance will be ongoing, as needed.
Commuting motorists should seek alternate routes. Expect delays during peak hours!