The anticipated work schedule on VT 117 for April 26, 2019

  • Reclaiming of the roadway surface from the Essex/Jericho town line to Skunk Hollow Road. 
  • Continue signal work at the VT 289 / 117 intersection.
  • Continued shoulder work throughout the project limits.

USE CAUTION – DRIVE SLOW!