The anticipated work schedule for the day is as follows:
- 8:30am The 2nd reclaiming phase to continue in the eastbound lane between the Essex/Jericho town line and N. Williston Road. This phase includes adding a stabilize agent added to the subbase. This agent takes time to cure causing a maximum of 2 hour lane restriction after installation is completed.
- 7:00am Continued slope stabilization work between VT-289 on-ramps and Greenfield Road.
Motorists should expect traffic control with lane closures allowing for alternating traffic.
DRIVE SLOW – DRIVE WITH CAUTION!