The following is the anticipated work schedule on the I-91 bridges for the week beginning Monday, April 15, 2019:
IMPORTANT NOTIFICATION
Monday thru Friday:
- 7 a.m. I-91 Exit 6 northbound On-Ramp will be closed for two weeks while the ramp is reconstructed to its original grade. All motorists will follow a signed detoured on Route 5 north to the Exit 7 northbound On-Ramp. The ramp is anticipated to be opened up on April 26, 2019 at which time all traffic will be switched over to the new I-91 Northbound Bridge.
- Fine grading of the NB Bridge approaches
- Grinding and fine grading of the NB Bridge approaches
- Weather permitting, paving the NB Bridge and approaches
- Continue to excavate and remove ledge at Pier #2 SB cofferdam
I-91 NORTHBOUND & SOUTHBOUND IS REDUCED TO ONE LANE WITH NO SHOULDERS WITHIN THE CONSTRUCTION ZONE.
I-91 NORTHBOUND MOTORISTS SHOULD BE AWARE OF MERGING RAMP TRAFFIC ENTERING THE ROADWAY!
PLEASE USE CAUTION!
Wednesday, April 10, 2019:
- Continued drainage and slope clearing between Skunk Hollow Road and the Essex/Jericho town line.
- Slope stabilization work between Bradley Bow Road and the Jericho/Richmond town line
Motorists should expect delays!
Be aware that travel is reduced to one lane with traffic control present within the construction zones.
The following is the anticipated work schedule on the I-91 bridges for the week beginning Monday, April 08, 2019:
IMPORTANT NOTIFICATION
On Monday, April 15, 2019 at 7 a.m. we will be closing the I-91 Exit 6 northbound On-Ramp for two weeks while the ramp is reconstructed to its original grade. All motorists will follow a signed detoured on Route 5 north to the Exit 7 northbound On-Ramp. The ramp is anticipated to be opened up on April 26, 2019 at which time all traffic will be switched over to the new I-91 Northbound Bridge.
************************************************************************
Monday thru Friday:
- Preparation work for placement of concrete at Pier #3 southbound
- Continue to excavate and remove ledge at Pier #2 SB cofferdam
- Grinding and fine grading of the NB Bridge approaches
- Continue installation of concrete curb on the bridge corners
- Continue maintenance of traffic control devices, due to weather
I-91 NORTHBOUND & SOUTHBOUND IS REDUCED TO ONE LANE WITH NO SHOULDERS WITHIN THE CONSTRUCTION ZONE.
I-91 NORTHBOUND MOTORISTS SHOULD BE AWARE OF MERGING RAMP TRAFFIC ENTERING THE ROADWAY!
PLEASE USE CAUTION!
The following is an update to the work schedule for the week beginning Monday, April 08, 2019:
Monday thru Friday:
• Weather permitting, drainage work to continue between the Essex/Jericho town line and Skunk Hollow Road
• Slope repairs between Bradley Bow Road, Jericho and Rogers Lane, Richmond
Tuesday thru Friday:
• Signal work at the intersection of VT 289 and VT Route 117
Traffic control will be present allowing for one-lane of alternating travel within the construction zones. Motorists please use caution!